Utilized Tire Recycling EPT Into Rubber Powder
hydraulic method comma effortless procedure and risk-free period of time
Mechanical description colon the tires far more than 800 need to cut comma and lower into four pieces in EPT periodthe dimensions of piece is two hundred-500mm period of time
Notes for utilizing tire cutter colon
a time period Examine the knives often comma if seem evident blunt comma it need to be preserve well timed comma and the services is 2-three years interval
b time period the oil in hydraulic station need to be filtered and altered regularly time period EPTly filter when each and every a single and half 12 months interval
c period Donning parts colon rubber seals comma sent with another set when ship the EPT to the purchaser time period
3 amp4 interval EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires smaller sized than 800mm tires period At the EPT temperature comma can be set immediately crushed into 50 ast fifty mm block comma so the following rotating can grind into 10-30 meshes or wire and fiber separation equipment period
Characteristic colon
This EPT is a compact framework comma advanced technological innovation comma lower vitality intake comma substantial effectiveness comma smashing off the examination room for the framework comma servicing is specifically convenient semi resources with carbide surfacing engineering comma substantial hardness comma substantial dress in resistance comma and repeated restore making use of comma so has a EPTer support existence semi rotary display screen for the lattice composition of metal mesh comma blanking big area comma enabling the screening of qualified rubber interval Following the partition of large tires can attain the result of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can straight be damaged into fifty ast50 mm of rubber block interval
Notes for making use of EPT tire shredder colon
a period Inject equipment oil into EPT oil lparhypoid equipment oil rpar comma primary bearings use calcium-based mostly grease lubrication comma 3 months soon after the procedure of the EPT comma the oil need to be replaced and cleanse the gasoline tank time period Given that then change the oil as soon as time each calendar year interval
b Soon after deal with three comma000 tons of squander rubber lparin normal situation rpar commathe customer must grind the blade slicing edge after time period of time The blades is the dress in components comma the EPT services lifestyle is 5-six several years comma when providing the EPT to the purchaser comma the shredEPTwill be outfitted with edge hardness layer patching substance lparelectrodes rpar interval
five period Double Rolls Rubber Crusher XKP-560
Use colon
Mainly utilised for crack massive rubber blocks into forty-50mm small rubber blocks period
Technical parameters colon
Framework colon The rollers adopt alloy cold tough cast irons with dress in-resisting comma tough figures time period The mill flour is with teeth comma large groove interval
In orEPTto extend the services lifestyle of the cracker comma we propose construct foundations for rubber cracker period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard equipment floor EPT with lower sound and EPTer provider lifestyle period
5Our crackers are made XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with good working platforms comma all the wires will be linked effectively from controlling method to motor period of time When utilizing the EPT comma the customers just need to connect directly to the EPT period of time
Complete-Automatic Waste Tyre Recycling Line to Rubber Powder
| No interval | Title | Design | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
| one | One hook debeader | LSJ-1200 | one | eleven | ||
| two | EPT tyre cutter | QDJ-1200 | one | 5 period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | 61 period5 | ||
| five | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
| six | Massive conveyor gear | BCL-8 | 1 | 2 | ||
| seven | Small conveyor tools | BCL-three | one | 1 period1 | ||
| 8 | Huge Magnet separator | BMS22 | 1 | 2 period2 | ||
| 9 | Little Magnet separator | SMS-one | 1 | one period1 | ||
| ten | Massive Shaking monitor | BSS-8 | one | seven period5 | ||
| 11 | Small Shaking display | SSS-three | one | 3 | ||
| twelve | Fiber separator | FS110 | one | five period5 | ||
| thirteen | Wonderful Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Square vibrating sieve | 600 | one | ||||
| Rubber powder collector | JFS500 | one | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | one | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | 1 | |||||
| Belt conveyer | one | period75 | ||||
| 14 | Steel Baller EPT | 30T | 1 | seven period5 | ||
| fifteen | Rubber powder EPT EPT | one | 3 | |||
| 24 | 334 period4KW | |||||
| No | Identify | design | amount | EPT | ||
| EPT tire pre-processing comma you will get lt fifty ast50MM rubber crumb
Semi-Automatic Squander Tyre Recycling Line to Rubber Powder |
||||||
| one | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
| 2 | Loop EPT | YQJ-295 | 1 | 15KW | ||
| 3 | Strip cutter | QTJ-370 | 1 | 5 period5 KW | ||
| 4 | Block cutter | QKJ-200 | one | eleven KW | ||
| Rubber powder processing colon you will get 20-30 mesh rubber powder commaat the exact same time comma separate the fiber and steel wire | ||||||
| 5 | Tyre crusher | XKP400 | one | forty five KW | ||
| XKP450 | fifty five KW | |||||
| XKP560 | 75 KW | |||||
| 6 | Huge conveyor tools | BCL-8 | one | 2 KW | interval | |
| 7 | Little conveyor equipment | BCL-three | 1 | one period1 KW | ||
| 8 | Big Magnet separator | BMS22 | one | two period2 KW | ||
| nine | Little Magnet separator | SMS-one | 1 | 1 period1 KW | ||
| ten | Huge Shaking display screen | BSS-8 | 1 | seven period5 KW | ||
| eleven | Tiny Shaking display | SSS-3 | interval | one | 3 KW | |
| 12 | Fiber Separator | FS110 | 1 | eleven KW | ||