
Total Automated Aged Tyre Recycling to Rubber PowEPTEPT
hydraulic technique comma easy procedure and safe time period
Mechanical description colon the tires much more than 800 require to reduce comma and minimize into 4 pieces in EPT periodthe measurement of piece is two hundred-500mm interval
Notes for making use of tire cutter colon
a period of time Inspect the knives regularly comma if seem obvious blunt comma it need to be keep timely comma and the support is 2-three years interval
b period of time the oil in hydraulic station need to be filtered and transformed frequently period of time EPTly filter when each one and 50 % calendar year interval
c period of time Sporting elements colon rubber seals comma shipped with an additional set when ship the EPT to the consumer interval
3 amp4 time period EPT tire shredEPTZPS-900
Use colon
This EPT can immediately crush tires scaled-down than 800mm tires interval At the EPT temperature comma can be place right crushed into 50 ast 50 mm block comma so the up coming rotating can grind into ten-thirty meshes or wire and fiber separation gear interval
Characteristic colon
This EPT is a compact construction comma sophisticated technology comma reduced power intake comma high effectiveness comma smashing off the test place for the construction comma servicing is particularly practical semi tools with carbide surfacing engineering comma large hardness comma large use resistance comma and repeated mend employing comma so has a EPTer service lifestyle semi rotary monitor for the lattice composition of metal mesh comma blanking large location comma enabling the screening of qualified rubber interval After the partition of massive tires can accomplish the result of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can immediately be broken into fifty ast50 mm of rubber block interval
Notes for using EPT tire shredder colon
a interval Inject gear oil into EPT oil lparhypoid gear oil rpar comma main bearings use calcium-based grease lubrication comma 3 months right after the procedure of the EPT comma the oil ought to be replaced and clean the gas tank period of time Since then modify the oil after time each and every calendar year interval
b Right after deal with three comma000 tons of waste rubber lparin regular situations rpar commathe consumer should grind the blade chopping edge as soon as time period The blades is the put on parts comma the EPT services daily life is 5-6 many years comma when delivering the EPT to the buyer comma the shredEPTwill be outfitted with edge hardness layer patching substance lparelectrodes rpar period
5 period Double Rolls Rubber Crusher XKP-560
Use colon
Largely employed for crack large rubber blocks into forty-50mm tiny rubber blocks time period
Complex parameters colon
Composition colon The rollers undertake alloy cold difficult solid irons with wear-resisting comma tough characters period The mill flour is with enamel comma substantial groove time period
In orEPTto extend the service existence of the cracker comma we advise create foundations for rubber cracker time period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard gear area EPT with lower sounds and EPTer service life period
5Our crackers are designed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with great operating platforms comma all the wires will be connected nicely from managing technique to motor period of time When utilizing the EPT comma the customers just require to connect immediately to the EPT time period
Total Automatic Previous Tyre Recycling to Rubber PowEPTEPT
| No interval | Title | Model | Qty interval lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | Single hook debeader | LSJ-1200 | 1 | eleven | ||
| 2 | EPT tyre cutter | QDJ-1200 | 1 | five period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | one | ninety | ||
| six | Massive conveyor tools | BCL-8 | 1 | 2 | ||
| 7 | Small conveyor gear | BCL-3 | one | 1 period1 | ||
| eight | Large Magnet separator | BMS22 | one | two period2 | ||
| 9 | Tiny Magnet separator | SMS-1 | 1 | one period1 | ||
| 10 | Huge Shaking screen | BSS-eight | 1 | 7 period5 | ||
| 11 | Small Shaking screen | SSS-3 | 1 | three | ||
| twelve | Fiber separator | FS110 | 1 | 5 period5 | ||
| 13 | Fantastic Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Square vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | 1 | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | one | |||||
| Belt conveyer | 1 | period75 | ||||
| 14 | Steel Baller EPT | 30T | 1 | seven period5 | ||
| 15 | Rubber powder EPT EPT | 1 | 3 | |||
| 24 | 334 period4KW | |||||
| No | Identify | design | amount | EPT | ||
| EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
| one | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
| 2 | Loop EPT | YQJ-295 | 1 | 15KW | ||
| three | Strip cutter | QTJ-370 | 1 | 5 period5 KW | ||
| four | Block cutter | QKJ-200 | one | 11 KW | ||
| Rubber powder processing colon you will get 20-30 mesh rubber powder commaat the very same time comma independent the fiber and steel wire | ||||||
| 5 | Tyre crusher | XKP400 | 1 | 45 KW | ||
| XKP450 | fifty five KW | |||||
| XKP560 | seventy five KW | |||||
| six | Large conveyor equipment | BCL-8 | 1 | two KW | period | |
| seven | Little conveyor tools | BCL-three | one | one period1 KW | ||
| 8 | Large Magnet separator | BMS22 | 1 | 2 period2 KW | ||
| nine | Tiny Magnet separator | SMS-one | 1 | one period1 KW | ||
| 10 | Large Shaking screen | BSS-eight | 1 | seven period5 KW | ||
| 11 | Modest Shaking screen | SSS-three | period of time | 1 | three KW | |
| twelve | Fiber Separator | FS110 | 1 | eleven KW | ||

